BUILDING PROJECT
![](/users_uploads/articles_article-contenu/generated/2208/re-csl-retouche-bal@3.jpg?ck=2019-04-30-152338)
![](/users_uploads/articles_article-contenu/generated/2211/02@3.jpg?ck=2019-04-30-152801)
![](/users_uploads/articles_article-contenu/generated/2209/011@3.jpg?ck=2019-04-30-152818)
![](/users_uploads/articles_article-contenu/generated/2357/mvt-maq3-02@3.jpg?ck=2019-06-03-091316)
![](/users_uploads/articles_article-contenu/generated/2243/csl-05@3.jpg?ck=2019-04-30-172208)
The entrance to the soup kitchen is from the existing platform in the park.
The base touches this space, serving as an external waiting area and possibly a terrace in relation to the clearance created between the new building, the green space, and the existing buildings.
![](/users_uploads/articles_article-contenu/generated/2242/csl-05@3.jpg?ck=2019-04-30-172221)
![](/users_uploads/articles_article-contenu/generated/2210/03@3.jpg?ck=2019-04-30-152457)